Water Supply

CHICAGO – Inflow Tunnel Des Plaines – McCook Reservoir

One 2-booms on tracks shaft ROBODRILL has been delivered at the end of august.

A 2-booms jumbo on tires with cabin on Caterpillar carrier will be operated from november

ATLANTA Water Supply Program Phase 1

We’ve delivered a small single-boom rig on tracks ans a 2-booms unit. Both machines are currently operated for vertical drilling in shaft, and later for tunnel drilling (the vertical booms will be swapped with horizontal booms). A small rig on a BROKK carrier is also being operated since september.